OsborneSpace

From Wiki Balkavani
Revision as of 07:53, 9 December 2024 by JabicAdmin (talk | contribs) (Created page with "'''OsborneSpace''', one of the key businesses of Michael Osborne and the Osborne GC in general, is a space-launch company that spearheaded the EotLP's control over space. == History == Discovery of OR-2Z-17 === OsborneSpace in Wellsiadric === === Move to Iseli === ==== Partnership with EotLP Government ==== ==== Osborne Space Station ==== <sup>Main Article: Osborne Space Station</sup> The Osborne Space Station was originally launched as part of the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

OsborneSpace, one of the key businesses of Michael Osborne and the Osborne GC in general, is a space-launch company that spearheaded the EotLP's control over space.

History

Discovery of OR-2Z-17

OsborneSpace in Wellsiadric

Move to Iseli

Partnership with EotLP Government

Osborne Space Station

Main Article: Osborne Space Station

The Osborne Space Station was originally launched as part of the

Smelly Cabbage Incident

Move to Balkavanians

OsborneSpace 2

Revamp of OsborneSpace operations.

3 Major rovers sent to the Moon

  1. Rover sent to scout out a location to put the base in a lunar cave
  2. Second UNINTELLIGBLE Rover to build landing pad and Basic landing lights. Rover (Construction Rover), then moved / disassembled the lander away
  3. 2nd Construction rover delivered along with construction parts for a first few modules of a moon base. Largest

Followed by 5 missions of 4 or 8 people and supplies to the moon base on Hercules 2, each accompanied by two AR launches to deliver full fuel load to the moon base the BRS5 Landing stage could then travel back to earth after refueling on the Moon.

Mirana 1 - 6th Launch - Zak Kealov, Mya Nates, Don Selvar, Miko Smyt, 3 additional pods to add to the existing 3 on the moon rover. 10 work days, working alongside the two construction Rovers. All 3 ended up perfectly functioning. 2 days were then reserved for integration and setup of the three new pods. Total 12 day stay

Mirana 2 - Sarah Osborne-Aster, Ayla Vernas, Neil Aster, James Hoskan, 2 robotic rovers added to the base along with a rover for Astronaut Mobility about the base. Once Assembled (which took 3 days) the first robot began to assist the astronauts in refueling their BRS-5. The second rover took 4 days to complete, but once it was finished it gave the base the capability to move Landed descent stages off the landing pad, allowing for more than one landing stage to be at the base at a time, for future expansion & staging projects which the base was aiming to work towards - total 10 day stay

Mirana 3 - Buzz Aster, Zarya Katonik (Cklserolvan), Yan Dolvaten (Cklserolvan), Alice Dareks. 3 additional pods added to the base complex, installed over 10 days, plus two to run verification steps & confirm proper berthing. Construction Rover M1CR-2 suffered minor damage after a handling error, which resulted in minor days, so construction ran into the 10th day of construction, which had been added to the schedule as a reserve, backup day for overflow work, now with 8 pods installed in the complex, multiple crews could be simultaneously supported by the complex. Katonik & Dolvaten became the first Cklserolvans on the moon. Total 12 days stay.

4. A 4th Unmanned Mission was launched after Mirana 3, with supplies for a second landing pad, assembled by the construction rovers. There were also parts to add piping to streamline refueling process. The final delivery on the fourth unmanned mission was the parts for additional fuel tanks for refueling more crafts simultaneously.

5. The 5th Unmanned Mission was a purely supply mission, which delivered huge quantities of life support, such as 10 persons worth of 3 weeks of oxygen, and 5 months of 10 persons worth of freeze-dried food, and 10 persons, 3 weeks of Water.

Mirana 4 & 5 - A combination of 2 separate missions of 4 Aethernauts each. Their launches were spaced out by six hours. Jyandror Vokat, Hans Kveloon (Mezhdomnoven), Valnyrie Skalver, Jane Solnan / Daryl Tost, Yamie Sander, Kate Von, Emily Tarsh.

Crew 4: Crew 4 carried a full cargo of 16 very large solar panels & backup batteries. Across 8 days, Crew 4 installed and hooked up all of the solar panels to the 8-pod Base. Once their own mission was complete, the 4 members of Crew 4 assisted Crew 5 with their own missions.

Crew 5: Crew 5's first mission was to install a small nuclear reactor 650 metres away from the base, and wired it into the main lunar Base Power Grid, to build up & supplement power consumption while the base would be on the dark side of the moon. That primary mission took almost 6 full days. The 4 members of Crew 5 then spent 2 days upgrading & monitoring the fleet of 6 robotic & pilotable rovers. Then, working with Crew 4, they added the ninth and 10th modules to the moon base, one a maintenance hub, with many tools, and the capabilities to fabricate their own tools. The other new hab was a fully operational launch control centre, the two habs together took 6 days, taking the total trip length to 14 days on the moon

Mirana 6 & 7 - Mirana 6 Launched 3 hours before Mirana 7 - Vla Tyr, Angel Naulon, Nora Leisombe, Belan Di Kostin / Sira Vanna, Hunter Van Solen, Artin Voloon, Arla Sylkent. The two crews together performed routine maintenance checks on the base & equipment, and found no unexpected deterioration or damage, in any equipment. After all checks had been completed (M+3D), the two crews came together to start assembly of a third craft from components brought by previous missions as well as their own. With a total of 8 days of work-time, the craft started to take shape. It was not completed (as planned) however the primary objective of proving the viability of space construction techniques. Total trip time of 12 days.

With Mirana 7 landed back on Earth, Operation 1 of OsborneSpace 2 came to a finish

Operation 2

Mission Series

Radio Symmetry (RS)

Space Exploration and Habitation System (SEHS)

Unmanned Supply (US)

Selene (AR)

Aerodynamically Correct Unit (ACU)

Ataksak (AT)

Emergency Station Evacuation System (ES2)

Jaeia

Unmanned Airborne High Jerk Space Plane (UAHJSP)

Emergency Tests for the Osborne Space Station Crews (ETFTOSSC)

Rover Off World (ROW)

Construction Off World (COW)

Mirana (MR)

Rockets

Radio Symmetry

Multiple Entry Craft

Unmanned Supply

Aether Refract

Jaeia

Hercules

Emergency Station Evacuation System

Unmanned Airborne High Jerk Space Plane

Space Stations

Osborne Space Station

Off-World Rovers

Off-World Structures

Mirana Moon Base