Rennian National Rail Line System
Pre-EotLP Railways
Settler-Era National Rail Line Construction

The EotLP's next major transport project after the initialization of the Highway System was their cargo and passenger rail lines, which were constructed in the same area divisions as the highways. Three of the four areas connected up to a major supply depot in Laiiwath, North of Rennia
Osborne created an intricate network of parallel and crossing lines to create a system that transmitted goods across the South Wing easily.
Octan took a different strategy, building two large Main lines, and many small, unconnected, tributary lines that ran onto the lines, to provide the quickest movement into Laiiwath from anywhere in the East Wing.
The National Construction Corps took a much more mediated strategy, running a few tributary lines, but focusing more on larger lines, rather than packing small lines into the area.
The National Rail Line began construction in 239, and was completed in jut under 5 years.